Program Management & Delivery Partners

We fulfil our promises

We govern enterprise programs to the point where closure can be evidenced, not just declared.

30+
years of delivery
5
industries
Waterfall → SAFe
delivery range
What a PMO holds
Scope

What is in, what is out, and who may change it.

Budget

Committed, spent, forecast. Reconciled every period.

Schedule

The critical path, and the float that is left on it.

Stakeholders

Who decides, who is consulted, who must simply be told.

Decisions

Logged with a date and an owner, or they did not happen.

Agreements

Contracts, variations, and what each side actually owes.

Communication

A cadence that holds when the program gets difficult.

Risk

Named early, owned by someone, priced before it lands.

Our services

Everything you need in one place

01Diagnose

Evidence before intervention

02Fix

Recover the program, then the governance that let it drift

03Run

The governance function, operated

04Intelligence

Delivery made legible early enough to act on

05Assurance

Independent evidence, from outside the delivery line

All five service lines
The five pillars

Five commitments, and the proof each one was kept.

Every engagement is measured against the same five promises. A circle closes only when its promise is kept.

إتقانQuality

Complete means evidenced. A deliverable is closed against its acceptance criteria, or it is still open.

قيمةValue

A program is worth what it returns. We measure that from the first period, not at handover.

عهدCommitment

A date we accept is a date we defend. If it is going to move, you hear it from us first, and early.

ثقةTrust

One version of the status, the same in the room as in the report. Bad news travels at the speed of good news.

رفيقCompanion

We stay past the handover, through the period when deferred problems surface.

Industries

The method is set by the industry, not by us.

Each sector governs delivery through its own standards and gates. We work inside them rather than around them.

Automotive & Embedded

Safety cases and supplier gates run in parallel with the software increments. The release is only as ready as its evidence.

  • Automotive SPICE
  • ISO 26262
  • IATF 16949
  • APQP / PPAP
  • SAFe

Energy & Industrial

Capital projects where the contract sets the cadence, long-lead procurement drives the critical path, and handover is a document exercise as much as a physical one.

  • FIDIC
  • Stage-gate / FEL 1–3
  • EPC delivery
  • Commissioning & handover
  • ISO 55000

Telecom & Digital

Transformation programs where the operating model changes underneath the delivery, and rollout governance has to survive both.

  • TM Forum eTOM
  • ITIL
  • TOGAF
  • Agile at scale

Smart Buildings & Government

Fixed go-live dates set by an occupancy or an opening. Systems integration, accreditation, and facilities handover all land in the same window.

  • RIBA Plan of Work
  • ISO 19650 (BIM)
  • Systems commissioning
  • Security accreditation

Technology

Portfolios where the plan re-forms every increment, and governance has to inform delivery rather than interrupt it.

  • SAFe
  • DevOps / DORA
  • ISO/IEC 27001
  • Product operating model
Industries in detail
Delivery approaches

Waterfall to SAFe. The method fits the program.

Capital projects and embedded software portfolios do not run the same way. Neither should their governance.

Plan fixed earlyPlan re-forms each increment

Waterfall

Stage gates

Capital projects where the design is fixed before the steel is cut, and a change late costs more than a change early.

Hybrid

Gated increments

Most real programs. A fixed outer contract and schedule, with iterative delivery inside each stage.

SAFe

PI planning

Software portfolios with many teams and a moving target, where the plan has to re-form every increment.

The delivery approach
Start

Start with the deadline you are worried about.

A named partner answers. Not a form queue.

info@waffapartners.com

Mohammed RaafatManaging Director & Founder